Skip to content
MaintWiz: Innovating Industrial AI

Shutdown software

Refinery and Petrochemical Turnaround Software

Short answer

Refinery turnaround software keeps the owner in control of a multi-unit stop. In MaintWiz every change after scope freeze is logged with who raised it and its approval, SIMOPS and shared cranes show by zone and day, the PMC's plan loads as Microsoft Project XML or Excel and works with Primavera P6, and seven readiness gates and the restart readiness agent hold the start-up. Executives see decisions in days and money.

How MaintWiz helps: MaintWiz is a comprehensive turnaround solution for refineries and petrochemical plants. The owner runs scope, SIMOPS, permits, spares, cost and restart readiness in one plan over the PMC's schedule.

  • Scope, plan, schedule, execution and close-out in one module
  • Critical-path Gantt with float and baselines
  • Seven readiness gates, signed off by name
  • Integrated ePTW: permits and LOTO isolations on every work order
  • Earned value: planned, earned and actual, with cost and schedule indices
  • Spares needed, in stock and short, with SAP status
  • Mobile work orders, offline on transaction screens
  • 15 AI agents propose each day; your people approve

By · Technical review: Murali Nerur Pasupathy · Published · Last reviewed

What MaintWiz adds:Scope change log after freezeSIMOPS by zoneOwner view of the PMC planSeven readiness gates

The turnaround

What makes a refinery turnaround hard to control?

Thousands of jobs, many contractors and one restart date: control slips in four places.

Scope growth after freeze

Findings on opening add work faster than the plan can absorb it.

SIMOPS and shared cranes

Crews, cranes and permits collide in the same zones on the same days.

The PMC's plan

The schedule sits in the PMC's tool; the owner sees reports, not the plan.

Long-lead parts

Catalyst, bundles, valves and gaskets decide what can start.

US refineries plan routine turnarounds on key units every 3 to 5 years, keeping a unit offline for several weeks to several months after 1 to 2 years of advance planning. 1,2 Where OSHA's process safety management standard applies, a pre-startup safety review is required for new facilities and for modified facilities when the change requires a change in process safety information. 3

MaintWiz

How does MaintWiz run a refinery turnaround?

The owner's questions, answered from one plan.

Refinery turnaround problems and the MaintWiz answer
Your problemWhat MaintWiz does
Scope growth after freezeScope funnel to the freeze, a change log with who raised each change and its approval, findings straight to the planner, and an emergent-work agent that proposes and a person approves
The PMC's planMicrosoft Project XML or Excel in, interoperable with Primavera P6, with the owner's layer of gates, permits and spares on top
SIMOPS and shared cranes72-hour look-ahead by crew, shared tool pools, availability by week, and permits shown against their work windows
Readiness at restartSeven readiness gates, the restart readiness agent, handover and close-out records
Executive controlExecutive view with decisions in days and money, earned value and S-curves
Long-lead partsSpares status with the SAP request or order behind each short part, and what each part blocks
MaintWiz: scope hours added after the freeze and the change log
Scope change log after the freeze. Scope hours after the freeze (frozen scope, added, removed or deferred, current scope), a Changes by day chart of hours added and removed, and a Scope change log with number, day, kind, description, hours, raised by and status.
MaintWiz: simultaneous operations view with the busiest zones by day and the conflict list
SIMOPS: busiest zones and conflicts. A Busiest 24 of 100 zones, by day chart with one row per zone (UTL-Q, HCU-N, CDU-A and others), coloured bars across the days, a blue today outline, and the buttons Resolve all by sequencing and Clear resolutions.
MaintWiz: executive overview with project health matrix and decisions waiting
Executive project health. Two panels. Project health has one row per running project, worst first, with colour-coded columns for finish vs due, slip vs baseline, cost vs budget, readiness and schedule and cost index. Decisions for you lists proposals with Approve and Decline buttons.

Petrochemical and chemical

How does MaintWiz handle petrochemical and chemical plant turnarounds?

Crackers and chemical units add a rolling programme and partial shutdowns to the turnaround itself.

Rolling programme

Furnace decokes through the year and the full turnaround sit in one portfolio, each as its own project.

Partial shutdowns

Permits and isolations on each work order show which equipment is out while neighbours run.

Look-ahead by crew

Compressor, furnace and cold-section crews see the next 72 hours and what is blocked.

Restart readiness

The restart readiness agent checks the gates before start-up, for a person to approve.

For unit-level guidance on chemical plant stops, read chemical plant shutdowns.

Measures

What should you measure in a turnaround?

A few measures tell you whether the turnaround went well; MaintWiz reads them from the same plan the field updates.

Duration against plan

Days from shutdown to start-up against the baseline.

Cost against budget

Spend and forecast at completion, from the live plan.

Scope growth after freeze

Hours added after the freeze, from the change log.

Recordable incidents

Incidents and near misses through the event.

First-time start-up

Units started without a repeat, and trips or leaks in the first weeks.

Worked example

Worked example: a bundle finding on day 20

ILLUSTRATION: a 45-day crude-unit turnaround with eleven contractors, a shared crane pool and a PMC schedule in Primavera.

  1. 1Finding raisedBundle opens with unlisted tube damage
  2. 2Change loggedAdded scope with hours, cost and approval
  3. 3Parts expeditedShort parts show SAP request or order
  4. 4Windows checkedPermits and crane slots against the new dates
  5. 5Restart dateFloat and decision in days and money
ILLUSTRATION: one emergent finding traced through scope, parts, permits and the restart date.
The owner sees the decision with its effect in days and money before the PMC's next schedule update arrives.

One system

Why run the turnaround inside the CMMS?

The turnaround uses the same equipment, spares and permits as everyday maintenance; keeping them in one system removes the re-keying between tools.

Work orders and history

Every turnaround job is a work order on the same equipment record, so findings and repairs stay in the asset's history.

Spares and SAP

Needed, in stock and short come from the same stores data, with the SAP request or order behind each short part.

Permits and isolations

ePTW permits and isolations sit on each work order, and a package cannot close while one is open.

AI agents with an approver

AI agents review scope, estimates and the schedule and write daily summaries; each proposal has a named person who approves it.

Who uses it

Who uses MaintWiz in a turnaround?

Each role sees its own part of one plan, so nobody works from a copy.

Who uses MaintWiz in a turnaround
RoleWhat they seeWhat they decide or record
Refinery manager and executivesProject health and decisions waitingApprovals in days and money
Turnaround managerScope, schedule, readiness and costScope changes and recovery actions
Owner plannersThe PMC's plan with gates, permits and spares on topWhat is ready to start
PMC and contractorsTheir packages, crews and permitsProgress and findings from the field
OperationsPermits, isolations and handbackRelease and acceptance of each unit

Getting started

How do you start with the plan your PMC already has?

Bring the schedule in as it is; the owner's controls go on top.

  1. 1

    Load last stop's job list

    Import the PMC's job list from Excel, or the schedule as Microsoft Project XML; MaintWiz is interoperable with Primavera P6.

  2. 2

    Fix the restart date

    Set the date that cannot move and let the critical path, float and baselines show what drives it.

  3. 3

    Set the gates

    Configure the seven readiness gates to your rules: materials, resources, predecessors, tools and scaffold, permits and isolations, scope and engineering, and go.

  4. 4

    Bring the crews in

    Planners, supervisors, technicians and contractors get role menus and the native mobile app, with offline work on transaction screens.

  5. 5

    Close and keep it

    Close-out records handover, lessons and deferred items, so the next stop is planned against this one.

MaintWiz is shutdown management software built into an AI CMMS, so the stop shares work orders, spares, ePTW permits and maintenance history with the rest of the plant. For the sector background, read refinery turnaround planning.

FAQ

Frequently asked questions

What does refinery turnaround software do?

It plans and controls a refinery or petrochemical turnaround: scope to the freeze and changes after it, the schedule and critical path, SIMOPS, permits, spares, readiness gates and restart, with an executive view of decisions.

Can MaintWiz take the PMC's Primavera P6 or Microsoft Project schedule?

Yes. MaintWiz imports and exports Microsoft Project XML, takes Excel task lists and is interoperable with Primavera P6, so the owner works on the PMC's plan rather than a copy of a report.

How does MaintWiz track scope growth after the freeze?

The scope funnel shows the frozen scope, and the change log records every addition with who raised it, its hours and its approval status.

How are SIMOPS and shared cranes coordinated?

The 72-hour look-ahead by crew, shared tool pools and weekly availability show clashes by zone and day, and permits are shown against their work windows.

Which readiness gates does MaintWiz hold before start-up?

Seven configurable gates: materials, resources, predecessors, tools and scaffold, permits and isolations, scope and engineering, and go, with the restart readiness agent checking them for a person to approve.

Does it handle petrochemical rolling furnace decokes and the full turnaround together?

Yes. The rolling programme and the turnaround sit in one portfolio as separate projects, with permits and isolations on each work order.

How are permits and isolations tied to turnaround work?

ePTW permits and LOTO isolations sit on each work order, and a package cannot close while a permit or isolation on it is open.

How do executives follow the turnaround?

The executive view shows project health, decisions waiting with their effect in days and money, earned value and S-curves from the same plan the field updates.

How is MaintWiz priced?

MaintWiz is a subscription that grows with your users, sites and modules, with a fixed implementation fee; ask for a written quote at a demo.

Can MaintWiz use the equipment records we already have?

Yes. Equipment lists and job lists load from Excel, schedules from Microsoft Project XML, and where the plant runs SAP, assets and their codes sync from SAP PM or MM.

Put the owner back in control of the turnaround

Book a demo and bring the PMC's last schedule. We will load it and show scope changes, SIMOPS and restart gates on your own units.

Book a demo