Shutdown software

Steel Plant Shutdown Software for Relines and Mill Stops

Short answer

Steel plant shutdown software plans a blast furnace or converter reline, and the annual mill stops, as projects that learn from the last one. In MaintWiz the previous reline stays on record to plan against, gas and confined-space work runs under ePTW permits and isolations with gates before start, production requests come back as decisions with their effect in days and money, and refractory and other long-lead parts show their SAP status.

How MaintWiz helps: MaintWiz is a comprehensive shutdown solution for steel plants. It keeps the record of the last reline and turns every added request into a decision with its cost in days and money.

  • Scope, plan, schedule, execution and close-out in one module
  • Critical-path Gantt with float and baselines
  • Seven readiness gates, signed off by name
  • Integrated ePTW: permits and LOTO isolations on every work order
  • Earned value: planned, earned and actual, with cost and schedule indices
  • Spares needed, in stock and short, with SAP status
  • Mobile work orders, offline on transaction screens
  • 15 AI agents propose each day; your people approve

By · Technical review: Murali Nerur Pasupathy · Published · Last reviewed

What MaintWiz adds:Last reline on recordGas and confined-space permitsDecisions in days and moneyRefractory status with SAP

The reline

What makes a steel plant shutdown hard to run?

A reline comes round once in many years, with a large temporary workforce and a hazardous atmosphere.

Lost memory

The people who ran the last reline have often moved on.

Gas and confined space

Carbon monoxide and confined-space entry across many crews.

Production pressure

Production asks for the furnace back sooner, without the cost on the table.

Long-lead refractory

Refractory, staves and tuyeres decide when the reline can start.

Blast furnace operators aim for campaigns of 15 to 20 years between relines 1, and one 2008 reline was reported at a record 70 days of downtime. 2 Carbon monoxide is the defining gas hazard 3, and furnace and vessel entry is confined-space work under a permit. 4

MaintWiz

How does MaintWiz run a reline or mill stop?

The reline manager's problems, each with its screen.

Steel shutdown problems and the MaintWiz answer
Your problemWhat MaintWiz does
Lost memoryHandover, lessons learnt and archive; this reline compared with earlier ones
Gas and confined spaceePTW permits and isolations on every work order, gates before start, and no package closed with a permit open
Production pressureDecision cards showing the effect of each request in days and money
ContractorsContractor approvals with name and time; own and contractor resources by trade
Long-lead refractorySpares status with the SAP request or order behind each short part
The plan itselfA configurable plan built from your own last reline, imported from Excel or Microsoft Project XML
MaintWiz: previous projects with hours, days, budget, cost, scope growth and slip, and planning guidance from history
Previous projects and planning guidance. A table lists four earlier stops and the current turnaround with type, hours, days, budget, cost, scope growth, slip and incidents. Below it, the guidance card averages scope growth, finish slip and cost overrun across the earlier stops and compares them with the contingency now held.
MaintWiz: cost of delay and downtime cost per day across projects
Cost of delay per day. A bar chart of cost of delay from +0 d to +10 d, driven by a per-day input set to 10.0 (M). Below it, a table gives downtime cost per day and exposure if one week late for five projects, from Refinery-A to Boiler-3 Overhaul.
MaintWiz: permits shown against the work windows they cover
Permits against the work windows. A timeline titled Permits against the work windows lists permits such as PTW-345-1 Cold work and PTW-284-2 Confined space, each as a bar from 6 Mar with a status label. Most read active; PTW-271-1 and PTW-271-2 are red and read not issued.

Mill stops

Can MaintWiz plan converter, caster and rolling mill stops too?

A steel plant runs several kinds of stop in a year; each is a project in the same history.

Converter relines

Planned from the plant's own lining records and heat counts.

Caster stops

Segment and roll work with permits and gates.

Rolling mill stops

Annual stops with stand and drive work on the critical path.

One roadmap

All the year's stops on one roadmap with blackout windows.

Measures

What should you measure in a reline?

A few measures tell you whether the reline went well; MaintWiz reads them from the same plan the field updates.

Reline days against plan

Blow-in against the planned date.

Incidents

Gas, confined-space and lifting incidents and near misses.

Ramp to design output

Days from blow-in to design output.

Cost against budget

Spend and forecast for the reline.

Campaign life achieved

Measured at the next reline, against the target.

Worked example

Worked example: production asks for ten days back

ILLUSTRATION: a blast furnace reline planned two years ahead; the planner who ran the last one has left.

  1. 1Last reline openedArchive shows its plan, duration and lessons
  2. 2Plan builtPackages and gates from your own history
  3. 3Request arrivesProduction asks for ten days back
  4. 4Decision cardEffect in days and money, with the risk
  5. 5Decision loggedApproved or declined by name
ILLUSTRATION: a request to shorten a reline turned into a recorded decision.
The cost of finishing early is on the table before the decision, not after the overrun.

One system

Why run the reline inside the CMMS?

The reline uses the same equipment, spares and permits as everyday maintenance; keeping them in one system removes the re-keying between tools.

Work orders and history

Every reline job is a work order on the same equipment record, so findings and repairs stay in the asset's history.

Spares and SAP

Needed, in stock and short come from the same stores data, with the SAP request or order behind each short part.

Permits and isolations

ePTW permits and isolations sit on each work order, and a package cannot close while one is open.

AI agents with an approver

AI agents review scope, estimates and the schedule and write daily summaries; each proposal has a named person who approves it.

Who uses it

Who uses MaintWiz in a reline?

Each role sees its own part of one plan, so nobody works from a copy.

Who uses MaintWiz in a reline
RoleWhat they seeWhat they decide or record
Works headCost and duration, and production's requestsDecisions in days and money
Reline project managerPackages, permits, contractors and sparesSequence and recovery
PlannerCritical path and the last reline's recordThe plan and its baseline
Furnace OEM and refractory contractorTheir packages and crewsProgress and findings
Safety and gas controlPermits and isolationsEntry and restart release

Getting started

How do you start: a plan from your last reline

Start from whatever survives of the last reline, and the date production expects.

  1. 1

    Load last stop's job list

    Import the last reline's job list from Excel, or the schedule as Microsoft Project XML; MaintWiz is interoperable with Primavera P6.

  2. 2

    Fix the blow-in date

    Set the date that cannot move and let the critical path, float and baselines show what drives it.

  3. 3

    Set the gates

    Configure the seven readiness gates to your rules: materials, resources, predecessors, tools and scaffold, permits and isolations, scope and engineering, and go.

  4. 4

    Bring the crews in

    Planners, supervisors, technicians and contractors get role menus and the native mobile app, with offline work on transaction screens.

  5. 5

    Close and keep it

    Close-out records handover, lessons and deferred items, so the next stop is planned against this one.

MaintWiz is shutdown management software built into an AI CMMS, so the stop shares work orders, spares, ePTW permits and maintenance history with the rest of the plant. For the sector background, read blast furnace reline planning.

FAQ

Frequently asked questions

What does steel plant shutdown software do?

It plans and runs blast furnace and converter relines and mill stops: scope, schedule, gas and confined-space permits, contractors, long-lead refractory and the restart, with each stop kept for the next.

Can MaintWiz plan a blast furnace reline?

Yes. The reline is a project with its packages, critical path, gates, permits and spares, built from your own last reline and imported from Excel or Microsoft Project XML.

How does MaintWiz keep lessons from the last reline?

Close-out archives each reline with its handover and lessons, and the comparison view sets this one against earlier stops on duration, cost, scope growth and incidents.

How are gas and confined-space permits tied to the work?

ePTW permits and isolations sit on every work order, gates check them before work starts, and a package cannot close while a permit is open.

How does MaintWiz show the cost of finishing a reline early?

Decision cards show the effect of a request in days and money, and the decision is recorded with the name of the person who took it.

Can it plan converter, caster and rolling mill stops too?

Yes. Each stop is its own project, and the roadmap shows all the year's stops with blackout windows.

How are the furnace OEM and refractory contractor managed?

Their crews are resources by trade, their approvals are recorded with name and time, and their plans load as Microsoft Project XML or Excel.

Is there a ready-made reline template?

The plan is built from your own last reline, so the packages, durations and gates match your furnace rather than a generic template.

How is MaintWiz priced?

MaintWiz is a subscription that grows with your users, sites and modules, with a fixed implementation fee; ask for a written quote at a demo.

Can MaintWiz use the equipment records we already have?

Yes. Equipment lists and job lists load from Excel, schedules from Microsoft Project XML, and where the plant runs SAP, assets and their codes sync from SAP PM or MM.

Plan the next reline against the last one

Book a demo and bring what you have of the last reline. We will build the plan and show the permits and decision cards on your own furnace.