Key takeaways
- JIPM launched the PM award system in 1964, and the TPM Excellence Awards have gone to some 2,000 plants.
- JIPM names associate agencies for assessment outside Japan, including in India, the UK, Thailand and Germany.
- Assessors read records: tag registers, step audits, Kaizen sheets, training and loss trends with dates and owners, and MaintWiz keeps each one on the equipment list.
- A full TPM programme takes 2.5 to 3 years to reach award level; MaintWiz is live in 6 to 8 weeks, so the records an assessor reads build up from the first month.
- MaintWiz, an AI CMMS built for TPM, holds the evidence for all eight pillars with 5S, OEE, Kaizen and OPL on one equipment list, with mobile capture, tag-to-work-order, IoT-triggered work orders and ePTW.
The award
What is the TPM Excellence Award?
JIPM (the Japan Institute of Plant Maintenance) describes the TPM Excellence Awards as awards in which the results of plants' TPM activities are judged and honoured. JIPM launched the PM award system in 1964 to strengthen enterprise constitutions and promote the modernisation of plant maintenance, and around 2,000 plants have received the awards since. JIPM presents the awards as part of its assessment operations for Japan's industrial sector.
The award is an external assessment of a site's programme. It sits above internal and step audits as a five-level external ladder (Figure 1).
The five levels of JIPM's TPM Awards
Overseas entries at each level, award years 2006 to 2025, lowest level at the bottom
- 1Award for TPM ExcellenceCategory A and Category B are parallel entry tiers; lists before 2008 use First and Second Category89356.9%
- 2Award for Excellence in Consistent TPM Commitment41926.7%
- 3Special Award for TPM Achievement17411.1%
- 4Advanced Special Award for TPM Achievement583.7%
- 5Award for World Class TPM Achievement251.6%
Source: JIPM TPM Awards winners archive, Awarded Year 2006-2025, outside Japan. 893 + 419 + 174 + 58 + 25 = 1,569 entries
maintwiz.comAI CMMS built for TPM
WhatsApp us
+91 93459 29168
Book a demoWhat is the history of TPM awards?
| Item | What JIPM states |
|---|---|
| Origin | The PM (plant maintenance) award system was launched in 1964 |
| TPM | JIPM proposed TPM in 1971 |
| Scale | TPM Excellence Awards have been given to some 2,000 plants |
| Assessment outside Japan | Through associate agencies |
Downloads
TPM award preparation checklist and evidence tracker (Excel)
ExcelTPM Excellence Award readiness tracker: evidence by pillar, results and award categoryEvidence tracker for the TPM Excellence Award: 11 areas, prompts by pillar, results trend and a mock shindan
- Sheets
- Dashboard, Inputs, Criteria, Evidence, Mock assessment (shindan), Prep tasks, Read me
- A4
- Version
- v1.1, 4 November 2026
ExcelTPM award mock assessment (shindan) pack: checks by area, floor walk route and scorePrepare for the TPM Excellence Award: score 11 areas on observable evidence, walk the floor in assessor order and see where work is needed.
Inside: 11 areas of six checks each: policy, organisation, the pillars, Office TPM and results · Where to look and what the assessor sees for every check, scored 0 to 5 · Floor walk route in assessor order with who explains and ready tick · Mock shindan (diagnosis) score and weakest area · Hand-over of scores to the award readiness tracker
- Sheets
- Dashboard, Inputs, Policy, Organisation, AM, FI, PM, QM, E&T, SHE, EEM, Office TPM, Results, Floor walk route, Hand over, Read me
- A4
- Version
- v1.0, 4 November 2026
ExcelTPM readiness self-assessment and pillar audit workbookScore 27 questions across 12 dimensions, read a readiness index from 0 to 100 and your place on the 12 steps
- Sheets
- Dashboard, Inputs, Assessment, Scale, Pillar rubric, Pillar audit, Plant Head page, Read me
- A4
- Version
- v1.0, 2 November 2026
ExcelAutonomous maintenance step coverage planner (plan v actual by quarter)See how many machines have passed each Jishu Hozen step against your quarterly plan
- Sheets
- Dashboard, Inputs, Machines, Plan dates, Actual dates, Plan, Read me
- A4
- Version
- v1.1, 5 November 2026
ExcelMulti-plant TPM maturity and OEE league table (group roll-up)Rank plants on TPM maturity and OEE, see what closing the gap to the best plant is worth, and which plant to copy
- Sheets
- Dashboard, Inputs, Maturity, Paste plant results, Compare, Group OEE, League table, Read me
- A4
- Version
- v1.0, 2 November 2026
Bring your evidence tracker to a demo: we load it into MaintWiz with Excel upload.
Who assesses
Who assesses sites outside Japan?
JIPM's awards page lists associate agencies for the assessment of TPM Excellence Awards outside Japan: the Technology Promotion Association in Thailand, the Confederation of Indian Industry in India, the SMMT Industry Forum in the United Kingdom and the Centre of Excellence for TPM in Germany.
Associate agencies and JIPM also run seminars, training and, in some countries, TPM clubs for sharing practice. In India the assessment runs through CII, which also runs its own certificate ladder and EOT award.
What do sites have to show?
Assessors look for live routines backed by dated records, the same evidence in every plant. MaintWiz keeps those records in one system, pillar by pillar.
Evidence a site shows for each TPM pillar
Eight pillars, with the Japanese pillar names
| Pillar | Japanese term | Evidence a site shows |
|---|---|---|
| Autonomous maintenance | Jishu Hozen 自主保全 | Step audit sheets for steps 1 to 7 and the fuguai tag register |
| Focused improvement | Kobetsu Kaizen 個別改善 | Kaizen sheets, why-why and P-M analysis, loss tree against the 16 major losses |
| Planned maintenance | Keikaku Hozen 計画保全 | PM compliance records and MP sheets |
| Quality maintenance | Hinshitsu Hozen 品質保全 | Quality assurance matrix and quality components |
| Early equipment management | Shoki Kanri 初期管理 | MP sheet feedback into new equipment |
| Education and training | Kyoiku Kunren 教育訓練 | One point lessons and skill records |
| Safety, health and environment | Anzen Eisei Kankyo 安全衛生環境 | Near-miss records and KYT sessions |
| Office TPM | Kanri Kansetsu Bumon 管理間接部門 | Loss and improvement records for administrative functions |
maintwiz.comAI CMMS built for TPM
WhatsApp us
Book a demo- Records with dates and owners: tag registers, audit sheets, project files, training records.
- Trends on defined measures, with definitions that did not change.
- Standards at the point of use and operators who can explain them.
- Evidence that audits lead to actions that close.
- Leaders who can describe the programme and visit the floor.
Preparation
How does preparation relate to implementation?
TPM implementation runs as a 12-step programme in four stages (preparation, introduction, implementation and consolidation). An award assessment tests the later stages of a mature programme, so the evidence has to be in place before the visit. MaintWiz puts the routines and records that carry those stages live in 6 to 8 weeks, with easy Excel uploads and guided project management, so the evidence builds from the first week of the TPM implementation plan.
A staged plan, step audits per pillar and a clear evidence trail are what a mature programme already has.
How to organise evidence before an assessment
- Obtain the current application outline from JIPM or its associate agency and copy its criteria exactly into a tracker.
- For each criterion, list the evidence (record, trend, photo, standard), where it is held and who owns it.
- Mark gaps and assign actions with dates.
- Run internal reviews against the tracker before the external visit.
- Keep evidence in one place, not in people's heads.

The award preparation checklist is a ready tracker: add each criterion, its evidence and its owner, then load it into MaintWiz through Excel.
Hold every assessment record in one place. Book a demo to see tags, audits, training and OEE exported to XLS and PDF as the evidence file for your next assessment.
MaintWiz AI agents run on your plant's own records, such as tags, work orders and losses, and generate a list of what needs to be watched. The agent proposes and your team approves, so every action keeps a named owner.
Winners per year
How many plants win each year?
Outside Japan, JIPM's archive records 335 award entries across 2021-25, about 67 a year, and 1,569 over 2006 to 2025, with India leading at 470. Compare your country year by year in TPM award winners by country.
The Excellence level, split by JIPM's printed category names
893 entries outside Japan, 2006 to 2025: 573 + 146 + 123 + 51 = 893
| Award for TPM Excellence, by printed name | Entries (share of 893) |
|---|---|
| Award for TPM Excellence, Category A | 573 (64.2%) |
| Award for TPM Excellence, Category B | 146 (16.3%) |
| Award for TPM Excellence, First and Second Category (2006-07 lists) | 123 (13.8%) |
| Award for TPM Excellence (2024-25 lists) | 51 (5.7%) |
Source: JIPM TPM Awards winners archive, Awarded Year 2006-2025, outside Japan
maintwiz.comAI CMMS built for TPM
WhatsApp us
Book a demoIndian winners
Which Indian companies have won JIPM TPM Excellence Awards?
JIPM publishes winners by year on its global site. The tables below list the Indian companies on the lists for 2023, 2024 and 2025: award category, company and plant, with several plants of one company shown in one row. The data comes from the JIPM winners pages for 2023, 2024 and 2025. JIPM also keeps a 1964 to 2025 archive of all winners.
Indian winners by year: 2025, 2024 and 2023
Indian winners, 2025 TPM Awards
| Award category | Company | Plant |
|---|---|---|
| Advanced Special Award for TPM Achievement | Bajaj Auto Limited | Pantnagar Plant, Uttarakhand |
| Advanced Special Award for TPM Achievement | QH Talbros Private Limited | IMT Manesar Plant |
| Advanced Special Award for TPM Achievement | REAL TALENT ENGINEERING PRIVATE LIMITED | Division-I, II & III |
| Special Award for TPM Achievement | BELRISE INDUSTRIES LIMITED | Badve Autocomps Pvt. Ltd. 1206 |
| Special Award for TPM Achievement | Harsha Engineers International Limited | Not listed by JIPM |
| Special Award for TPM Achievement | Lumax Industries Limited | Pantnagar; Bidadi, Bengaluru |
| Special Award for TPM Achievement | TDK India Private Limited | Nashik |
| Award for Excellence in Consistent TPM Commitment | BELRISE INDUSTRIES LIMITED | Plant 1116 |
| Award for Excellence in Consistent TPM Commitment | Hero MotoCorp Ltd. | Vadodara Plant |
| Award for Excellence in Consistent TPM Commitment | Lumax Industries Limited | Bawal Plant; Dharuhera Plant |
| Award for Excellence in Consistent TPM Commitment | SPARK MINDA | Minda Corporation Limited, Pantnagar, Uttarakhand |
| Award for Excellence in Consistent TPM Commitment | Sansera Engineering Limited | Not listed by JIPM |
| Award for Excellence in Consistent TPM Commitment | Sigma Electric Manufacturing Corporation Private Limited | Not listed by JIPM |
| Award for TPM Excellence | ATC Tires Private Ltd. | TN Plant |
| Award for TPM Excellence | KALPATARU PROJECTS INTERNATIONAL LIMITED | Gandhinagar Plant; Raipur Plant |
| Award for TPM Excellence | Kirloskar Brothers Limited | Kirloskarvadi SMPD CIF |
| Award for TPM Excellence | Lumax Auto Technologies Ltd. | Kuruli, Chakan (Metallics) |
| Award for TPM Excellence | Lumax Industries Limited | Chakan Plant-3 |
| Award for TPM Excellence | Napino Control Systems Private Limited | Manesar |
| Award for TPM Excellence | Ramkrishna forgings limited | Plant V |
| Award for TPM Excellence | Rucha Engineers Pvt Ltd | Plant 4, Plant 7; Plant 1, Plant 3, Plant 6 & Plant 11 |
| Award for TPM Excellence | Sakata Inx (India) Private Limited | Panoli Plant, Gujarat; Bhiwadi Plant, Rajasthan |
| Award for TPM Excellence | Sarda Metals & Alloys Ltd. | Sarda Group |
| Award for TPM Excellence | Suprajit Engineering Limited | Unit-5, Chakan, Pune; Unit-7, Pantnagar |
Indian winners, 2024 TPM Awards
| Award category | Company | Plant |
|---|---|---|
| Advanced Special Award for TPM Achievement | Bajaj Auto Limited | Commercial Vehicle Division (CVD), Waluj Plant, Aurangabad; Motorcycle Division (MCD), Waluj Plant, Aurangabad |
| Advanced Special Award for TPM Achievement | TVS Motor Company Limited | Plant 1, 2, 9 & EV, Hosur; Plant 4, Mysore; Plant 7, Nalagarh |
| Special Award for TPM Achievement | Tirth Agro Technology Private Limited | Farm Tillage Solution Business Unit; Gears and Transmission Business Unit |
| Award for Excellence in Consistent TPM Commitment (Silver) | ABI Showatech (India) Private Limited | Foundry Division (Light Alloy Products & Lap Ross Engg) |
| Award for Excellence in Consistent TPM Commitment | Kirloskar Brothers Limited | Dewas |
| Award for Excellence in Consistent TPM Commitment | Lumax Auto Technologies Limited | Narasapura Plant |
| Award for Excellence in Consistent TPM Commitment | Napino Auto & Electronics Ltd. | Haridwar |
| Award for TPM Excellence | ALP AEROFLEX (I) PVT. LTD | Nashik |
| Award for TPM Excellence | ATC Tires Private Limited | Dahej |
| Award for TPM Excellence | Belrise Industries Limited | Khalumbre, Chakan, Pune (1113); Pantnagar, Uttarakhand (1109) |
| Award for TPM Excellence | Economic Explosives Limited | Sawanga |
| Award for TPM Excellence | Godrej & Boyce Mfg. Co Ltd. | Godrej Storage Solutions, Chennai |
| Award for TPM Excellence | Jamna Auto Industries Limited | Chennai Plant |
| Award for TPM Excellence | KALYANI TECHNOFORGE LIMITED | Bhiwadi, Rajasthan |
| Award for TPM Excellence | Kirloskar Ebara Pumps Limited | Kirloskarvadi |
| Award for TPM Excellence | MURUGAPPA MORGAN THERMAL CERAMICS LIMITED | Ranipet |
| Award for TPM Excellence | Rajratan Global Wire Limited | Pithampur, Indore |
| Award for TPM Excellence | RSB TRANSMISSIONS (I) LTD. | Pune Plant |
| Award for TPM Excellence | Sartorius Stedim India Pvt Ltd | Not listed by JIPM |
| Award for TPM Excellence | Sigma Electric Manufacturing Corporation Private Limited | Unit I, Pune |
| Award for TPM Excellence | TATA STEEL LIMITED | Tata Steel Gamharia |
| Award for TPM Excellence | TDK CORPORATION | Navitasys India Pvt. Ltd |
| Award for TPM Excellence | Tirth Agro Technology Private Limited | Hi-Tech Farm Solution |
| Award for TPM Excellence | TITAN COMPANY LIMITED - JEWELLERY DIVISION | Not listed by JIPM |
Indian winners, 2023 TPM Awards
| Award category | Company | Plant |
|---|---|---|
| Award for World Class TPM Achievement | Bajaj Auto Ltd. | Chakan Plant, Pune |
| Special Award for TPM Achievement | Jindal Steel & Power | TRB Iron Ore Mines, Tensa |
| Special Award for TPM Achievement | Lumax Auto Technologies Limited | Pantnagar Plant |
| Special Award for TPM Achievement | REAL TALENT ENGINEERING PRIVATE LIMITED | Not listed by JIPM |
| Award for Excellence in Consistent TPM Commitment | ABI Showatech (India) Private Limited | ABI Turnamatics |
| Award for Excellence in Consistent TPM Commitment | ADVIK Hi-Tech Pvt. Ltd. | Pantnagar |
| Award for Excellence in Consistent TPM Commitment | Amara Raja Energy & Mobility Limited | Automotive Strategic Business Unit (ASBU) |
| Award for Excellence in Consistent TPM Commitment | Apcotex Industries Limited | Valia Plant |
| Award for Excellence in Consistent TPM Commitment | Lumax Auto Technologies Ltd. | Chakan |
| Award for Excellence in Consistent TPM Commitment | LUMAX INDUSTRIES LIMITED | Bengaluru Bidadi Plant |
| Award for TPM Excellence, Category A | ALP NISHIKAWA CO.PVT.LTD | Gurgaon, Haryana |
| Award for TPM Excellence, Category A | Amara Raja Energy & Mobility Limited | Industrial Strategic Business Unit (ISBU) |
| Award for TPM Excellence, Category A | Automotive Axles Limited | Hootagalli Industrial Area, Mysuru |
| Award for TPM Excellence, Category A | CIE Automotive India Limited | Bill Forge Division Plant-1 |
| Award for TPM Excellence, Category A | INTERNATIONAL PACKAGING PRODUCTS PRIVATE LIMITED | Silvassa |
| Award for TPM Excellence, Category A | Jayaswal Neco Industries Ltd. | Rolling Mills & Bright Bar Unit |
| Award for TPM Excellence, Category A | Lumax Industries Limited | Chakan |
| Award for TPM Excellence, Category A | Sigma Electric Manufacturing Corporation Private Limited | Unit-II, Pune; Unit-III, Pune; VKIA, Jaipur |
| Award for TPM Excellence, Category A | Solar Industries India Limited | Chakdoh |
Case study commendations, 2025 and 2024
| Year | Company | Plant |
|---|---|---|
| 2025 | Bajaj Auto Limited | Pantnagar Plant, Uttarakhand |
| 2025 | Belrise Industries Ltd | Badve Autocomps Pvt. Ltd. 1206 |
| 2024 | Bajaj Auto Limited | Commercial Vehicle Division (CVD), Waluj Plant, Aurangabad; Motorcycle Division (MCD), Waluj Plant, Aurangabad |
| 2024 | Napino Auto & Electronics Ltd. | Haridwar |
| 2024 | TVS Motor Company Limited | Plant 1, 2, 9 & EV, Hosur; Plant 4, Mysore; Plant 7, Nalagarh |
Multi-plant groups appear once per award. MaintWiz rolls OEE up from equipment to line to plant, with roles set per plant, so each plant's evidence file is ready for its own assessment. Score the spread across your sites with the multi-plant maturity and OEE roll-up workbook.
Worth it?
Is applying for the award worth it?
Yes. It gives a plant a shared goal, an outside view of the programme and recognition for its teams. MaintWiz keeps the evidence pack an assessor reads, with tags, audits, training and loss records carrying dates and owners on one equipment list, exported to XLS and PDF.
Between assessments
How do plants keep an outside view between award assessments?
Cross-plant audits, peer visits and step audits keep the programme honest between award assessments. Internal cross-plant audits use a common scoring sheet and auditors from other sites. Peer visits and benchmarking days, such as those run by associate agencies and industry bodies, show what other plants do. Customer or corporate audits may cover related ground. The step audits within autonomous maintenance and the self-assessment give a regular internal view. Step audits, cross-plant scores and the self-assessment sit on one equipment list in MaintWiz.
| Option | What it gives | Best used for |
|---|---|---|
| Internal step audits | Regular, cheap, specific to a pillar | Every pillar, between external visits |
| Cross-plant audit | A view from peers, comparable scoring | Comparing sites on one scoring sheet |
| Associate agency seminars and visits | Exposure to practice and to assessors' expectations | Learning what assessors look for |
| JIPM TPM Excellence Award assessment | An external assessment against JIPM's standard | Recognition of a mature programme |
Questions to ask the associate agency
- Which award categories and prerequisites apply to our sector and size?
- What is the current application outline and how often does it change?
- What does the process involve, in what sequence, and what do sites underestimate?
- What does the assessment cost in fees and staff time?
- Can we visit a winning site or attend a seminar first?
- What support is available for sites preparing for an assessment?
Using the award criteria as a roadmap without applying
Some plants never apply but use the published structure of a mature programme as a guide to what to build: policy, organisation, pillar activities, measures and evidence. The staged implementation plan and the pillar guide turn that structure into weekly routines, and MaintWiz holds the records for each stage, so the evidence is ready on the day the plant applies.
Next steps
Next steps
- Score your plant first: TPM self-assessment.
- Keep tags, audits and training evidence in one record: TPM software.
- See your evidence file on your own equipment list: book a demo.
FAQ
Frequently asked questions
What is the TPM Excellence Award?
It is JIPM's award for plants whose TPM activities have been assessed and judged to meet its standard. JIPM's award system began in 1964, and around 2,000 plants have received it.
Who can apply for the TPM Excellence Award?
Plants that run TPM can apply through JIPM or, outside Japan, through its associate agency, such as CII in India. The criteria and prerequisites are in JIPM's application outline, and MaintWiz holds the records the assessment reads.
Where are the TPM award criteria?
In JIPM's application outline, obtained from JIPM or its associate agency in your country, such as CII in India. Copy each criterion into the free readiness tracker, list the evidence and owner beside it, and load the list into MaintWiz through Excel.
How long does it take to reach award level?
A full TPM programme takes 2.5 to 3 years to reach award level (Shen 2015). MaintWiz rolls out the entire TPM in 6 to 8 weeks, so the records an assessor reads build up from the first month.
What does MaintWiz offer a plant preparing for the award?
MaintWiz holds the evidence an award assessment looks at: tags, audits, training and loss records with dates and owners, on one equipment list, so the file is ready when the assessor asks.
Does winning the award lead to better results?
Yes. It gives the site a shared goal, an outside view and dated, owned registers for tags, step audits, Kaizen and losses. MaintWiz keeps those registers live on one equipment list after the assessors' visit.
Is the JIPM TPM award the same as a CII certificate?
No. The JIPM TPM Excellence Award is assessed against JIPM's standard, with the Confederation of Indian Industry acting as JIPM's associate agency in India. CII also runs its own certificate ladder and EOT award, with milestones at about one, two and three years of implementation.
Sources
Sources
- JIPM, About TPM https://www.jipmglobal.com/about/tpm/
- JIPM, TPM Awards. TPM and the TPM logo are trademarks or registered trademarks of JIPM in Japan and other countries. https://www.jipmglobal.com/service/tpm-awards/
- Shen, C.C. (2015). Discussion on key successful factors of TPM in enterprises. Journal of Applied Research and Technology 13(3), 425-427. https://elsevier.es/es-revista-journal-applied-research-technology-jart-81-articulo-discussion-on-key-successful-factors-S1665642315000371
- JIPM Global, Winners for 2023 Awards https://jipmglobal.com/tpm/archives/awardslist/2023_en
- JIPM Global, Winners for 2024 Awards https://jipmglobal.com/tpm/archives/awardslist/2024_en
- JIPM Global, Winners for 2025 Awards https://jipmglobal.com/tpm/archives/awardslist/2025_en
- JIPM Global, TPM Awards winners archive 1964-2025 (Excel workbook, sheet by award year) https://jipmglobal.com/tpm/wp-content/uploads/TPM-Awards-Winners_1964-2025.xlsx
