Key takeaways
- MaintainX states mobile work orders, QR requests, PM triggers, public prices and a TPM page that says it supports all eight pillars.
- That page ties general features (inspections, preventive maintenance, audit trails, dashboards, safety checklists) to some pillars; a tag register, Kaizen workflow, 5S, one point lessons and early equipment management are not stated on its public pages.
- MaintWiz states all eight pillars, 5S, OEE, Kaizen and one point lessons with a dashboard each, and runs tags to work orders in one system.
- MaintWiz, the AI CMMS built for TPM, carries the work orders and the whole TPM programme in one system.
Verdict
The short verdict
MaintWiz and MaintainX: what each states for TPM
From each vendor's own public pages, read on 2 November 2026
| Area | MaintWiz | MaintainX |
|---|---|---|
| Autonomous maintenance records | Stated | Partly |
| Abnormality or tag register | Stated | Partly |
| Planned maintenance | Stated | Stated |
| Focused improvement, Kaizen | Stated | Partly |
| Quality maintenance | Stated | Partly |
| Early equipment management | Stated | Not stated |
| Education and training | Stated | Not stated |
| Safety: near miss, BBSO, permits | Stated | Partly |
| Office TPM | Stated | Not stated |
| 5S audits | Stated | Not stated |
| OEE and losses | Stated | Partly |
| One point lessons | Stated | Not stated |
| Areas stated | 12 of 12 | 1 of 12 |
Stated with feature detail Claimed or partly stated Not stated on public pages
maintwiz.comAI CMMS built for TPM
WhatsApp us
Book a demo| MaintWiz | MaintainX | |
|---|---|---|
| Scope stated | Running the whole TPM programme in one AI CMMS | A mobile-first CMMS for maintenance teams |
| Eight pillars, 5S, OEE, Kaizen, OPL | All stated, one dashboard per pillar | Eight-pillar claim; general features tied to some pillars, none to 5S, Kaizen workflow or one point lessons |
| Planned maintenance | Schedules with time, condition and event triggers; work bench; PM compliance reports | Time, meter, condition and usage triggers; pass or fail inspections |
| Tag or abnormality register | Yes, six status tabs, can become a work order | QR requests and flagged anomalies; no tag register named |
| Pricing | Quoted to modules and users | Public per user per month: $0, $20 to $25, $65 to $75, custom |
Downloads
TPM software scorecard and cost planner for the comparison (Excel)
ExcelTPM software RFP template and vendor scorecard (42 weighted requirements)Weight 42 requirements, score up to five vendors, run a proof of concept on your own equipment list and read a ranked
- Sheets
- Dashboard, Inputs, Scorecard, Pilot scoring, Questions, Proof of concept, Read me
- A4
- Version
- v1.1, 4 November 2026
ExcelTPM software cost planner (three-year)Compare the three-year cost of TPM software on your users, plants and services
- Sheets
- Dashboard, Inputs, Costs, Results, Read me
- A4
- Version
- v1.2, 4 November 2026
PDFTPM software demo-day script: 11 tasks to run on your own dataCompare TPM software fairly: eleven tasks to run live on your own equipment list, with timings, pass criteria and a score column for each vendor.
Inside: Eleven live tasks, from raising an abnormality to an Excel upload · Minutes allowed and the pass condition for each task · Scores 0 to 5 in three vendor columns · Same tasks, same data, same stopwatch for every vendor
- Pages
- 1
- A4 landscape
- Created
- 5 November 2026
ExcelTPM business-case workbookTurn downtime, output, maintenance cost and scrap into payback, IRR and a one-page board summary from your own figures
- Sheets
- Dashboard, Inputs, Case, Board summary, Read me
- A4
- Version
- v1.2, 4 November 2026
ExcelExcel to TPM software migration checklist (8-week plan)Plan the move from Excel to TPM software in eight weeks, from scope and master data to the parallel run and cut-over
- Sheets
- Dashboard, Inputs, Inventory, Mapping, Checklist, Read me
- A4
- Version
- v1.1, 4 November 2026
Bring your scorecard to the demo: we score MaintWiz live against your criteria.
MaintainX states
What do MaintainX's public pages state?
Its pages state operators completing inspections from a phone, QR-code work requests that need no login, preventive maintenance with time, meter, condition and usage triggers, and downtime tracking. Its pricing page publishes four plans per user per month, with meter-based maintenance from the Premium plan and IoT sensor integrations, single sign-on and its AI assistant on Enterprise.
MaintWiz carries work orders and planned maintenance (time, condition and event triggers), and adds the TPM routines on the same equipment list.
Pillar by pillar
Pillar by pillar: what each states
MaintainX's TPM page says the product "supports all eight pillars of TPM". The same page ties general features to some of them: operator inspections, request handling, preventive maintenance, audit trails, downtime dashboards and safety checklists. The table sets the twelve TPM areas against what each vendor states.
| TPM area | MaintWiz | MaintainX |
|---|---|---|
| Autonomous maintenance records | Yes: records, abnormality register, JH dashboard | Partly: operator inspections and QR requests |
| Tag or abnormality register | Yes | Partly: QR requests and flagged anomalies; no tag register named |
| Planned maintenance | Yes | Yes |
| Focused improvement and Kaizen | Yes: idea sheet and poka-yoke sheet | Partly: dashboards for reliability; no Kaizen workflow named |
| Quality maintenance | Yes: rejection RCA, QD matrix, complaints | Partly: required fields and approvals give an audit trail |
| Early equipment management | Yes: MP sheets | Not stated |
| Education and training | Yes: plan, sessions, schedule | Not stated |
| Safety | Yes: incident, BBSO, near miss, ePTW | Partly: safety checklists and lock-out procedure templates |
| Office TPM | Yes | Not stated |
| 5S audits | Yes | Not stated |
| OEE and losses | Yes: equipment, line, plant | Partly: downtime and availability |
| One point lessons | Yes | Not stated |
MaintWiz covers
Where MaintWiz covers more of TPM
Tags, 5S and Kaizen
In MaintWiz the abnormality register, the 5S audit, the Kaizen idea sheet and the one point lesson are modules with dashboards. A red, white or yellow tag moves through open, completed, auditee work completed and closed, and shows on the Jishu Hozen dashboard.
Safety, quality and equipment design
The safety pillar has incident reporting, BBSO, near miss observations and electronic permit to work. The quality pillar has rejection RCA and a QD matrix. Early equipment management runs on MP sheets. In MaintWiz these pillars are ready-made modules with their own dashboards.
The programme itself
Training plans and sessions, an office TPM view and TPM Central (goals, events, news and a document repository) keep the programme in the AI CMMS. MaintWiz TPM software maps every pillar to its own module and dashboard (Figure 2).

Workflows
How do the workflows differ?
| Workflow | MaintWiz | MaintainX |
|---|---|---|
| Operator finds a fault | Raises a tag with colour, type and photo on a phone; it is assigned, tracked and closed; it can become a work order | Scans a QR code or flags an anomaly; it becomes a prioritised work order |
| Planned work | PM schedules with time, condition and event triggers, upcoming 12 schedules, work bench and approval flow | PM with time, meter, condition and usage triggers; inspections with required fields |
| Loss and OEE | Production log per shift, loss masters, downtime report by category and type, line and plant roll-up | Downtime tracking and availability; OEE named, loss tree not described |
| Programme view | Dashboard per pillar plus TPM Central | Advanced analytics and report builder by plan |


Cost compared
What does MaintainX cost compared with MaintWiz?
MaintWiz is quoted to the modules and users you need, so the number reflects the pillars you switch on. To compare, list the TPM routines you want (tags, 5S, Kaizen, OPL, early equipment management, office TPM, training) and price what each product needs to carry them, including any extra tools. The free buyer's guide and TCO planner does that sum.
MaintWiz rolls out the entire TPM in 6 to 8 weeks with easy Excel uploads and guided project management, and SAP PM and MM connect through web services.
Alternative?
Is MaintWiz an alternative to MaintainX for TPM?
Yes, when the programme is TPM. MaintWiz carries planned maintenance and work orders as MaintainX does, and adds the tag register, 5S, Kaizen, one point lessons, early equipment management, safety, quality and training, with a dashboard for each pillar. Moving over starts with your lists: equipment and masters load from Excel templates, and the implementation team guides the set-up of your tags and PM schedules.
Bring your pilot area and the checklists you run in MaintainX today to a demo.
FAQ
Frequently asked questions
Is MaintWiz better than MaintainX for TPM?
For running the whole TPM programme, MaintWiz covers more: all eight pillars, 5S, OEE, Kaizen and one point lessons with a dashboard each. MaintainX is a mobile CMMS whose TPM page ties general features to some pillars and names no tag register, 5S or one point lesson feature.
Does MaintainX support all eight TPM pillars?
Its TPM page says it supports all eight pillars. The features it ties to them are general: operator inspections, QR requests, preventive maintenance, audit trails and downtime dashboards. A tag register, 5S, Kaizen workflow, one point lessons and early equipment management are not named.
Does MaintainX have a tag or abnormality register?
Its public pages describe QR requests and flagged anomalies that become work orders; a red, white or yellow tag register is not named. MaintWiz has an abnormality register with six status tabs.
Which is cheaper, MaintWiz or MaintainX?
MaintWiz is quoted to the modules and users you need. Compare the full three-year cost of the TPM routines you run, including any extra tools for tags, 5S, Kaizen and one point lessons, with the free TCO planner.
Can MaintWiz replace MaintainX?
Yes, for a TPM programme. MaintWiz covers the work orders and planned maintenance and adds tags, 5S, Kaizen, one point lessons, safety, quality and training. Equipment and masters load from Excel templates, and the entire TPM rolls out in 6 to 8 weeks.
Sources
Sources
- MaintainX, TPM use-case page, read 2 November 2026
- MaintainX, pricing, read 2 November 2026
- MaintainX, preventive maintenance, read 2 November 2026
